All MARKET SEGMENTS OF BUILDINGS
«Free 3D building designer and calculator»
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia

PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia

06/04/2021

The Tula plant announces the order for an export deal for a standard pre-fabricated sports hall 15W x 30L x 7.2H in Tskhinvali, the Republic of South Ossetia. The main client is one of the local boarding schools. With the support of Russian commercial structures and a thorough analysis of manufacturers of prefabricated steel buildings for 2 years in Russia and the CIS countries, it was the Tula plant that was chosen because of its extensive experience in the design and manufacture of complete sports facilities (especially on the Crimean Peninsula for the Aksenov Administration)

The gym consists of two main parts: Part No. 1 (the gym itself with an internal height of 6 m) and Part No. 2 - a technical area (changing rooms, a corridor, showers, a recreation room, an electrical room, a room for storing sports equipment) The hall includes an ultra-modern roof skylight with 3 meters of width for natural lighting (significant savings on electricity even in winter) and several automatic sections for natural ventilation (including the ground control unit) For the technical area, all internal non-combustible partitions (100mm, RAL 9003) and openings (for windows and doors) were included into the building kit.

The prefabricated building uses modern windows with polycarbonate (a special version specifically for sports facilities. 8-layer, 40mm with a warm profile. Polycarbonate, in contrast to double-glazed windows, diffuses light and facilitates games and sports events on sunny days. Plus, the thermal insulation properties are higher.)  The complete set of the building includes all fire doors with anti-panic and door closer.

Steel load-bearing structures are designed on the basis of the most modern LSGF technology (cold-formed galvanized profiles are used for columns, trusses and a run-through system) All secondary elements made out of ferrous metal are supplied only on the basis of high-quality powder coating (without GF-021 primer), which makes metal structures premium in terms of corrosion protection for many years to come. The steel frame is 100% assembled on the basis of bolted connections. For production, ONLY Ist class of metal zinc coating (S350) is used. Strips of Novolipetsk MC.

The pre-fabricated steel frame is sheathed with non-combustible sandwich panels with increased thickness at the construction site (walls - 120mm and roof - 150mm. Density of RockWool - 110 kg / cubic meter, Profiled sheet thickness - at least 0.5mm) aimed at improving thermal insulation properties. Such steel buildings can be heated without gas with electricity.

PK Vesta plant announces the solemn handover of the next pre-fabricated sports hall 15W x 30 x 6V made of fabricated metal structures (LSGF) to the President of South Ossetia - Anatoly Bibilov. The order was placed at the Tula plant after a number of successful typical municipal projects of sports gyms for the administration of Aksenov on the Crimean Peninsula (Crimea) Example: https://www.youtube.com/watch?v=I7VEZXkjYL0&feature=emb_logo

During the solemn event, representatives of the Presidential Administration participated in the acceptance of the sports facility. Children from a local school held a demonstration concert with a performance in front of the President of South Ossetia - Anatoly Bibilov, who was extremely satisfied with the speed of the construction of the sports hall and the quality of the enclosing and supporting structures. Also, an excursion was held for the President in the technical area of ​​the gym - locker rooms for children, showers, a room for teachers, etc.

The prefabricated gym was free of charge calculated and designed in the innovative online service WebSteel, available to everyone around the world in Eurasia, the Middle East and Africa.

PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
PK Vesta plant announces an export order for a pre-fabricated sports hall 15x30x7.2 in Tskhinvali, the Republic of South Ossetia
Main currency


CIS
ASIAN
AFRICA
up
?
PK Vesta LLC uses cookies. By continuing to work with pkvesta.com, you acknowledge the use of your browser cookies by the site, which help us make this site more convenient for users. However, you can prevent the storage of certain cookies in your browser settings. The processing of user data is carried out in accordance with: "POLICY REGARDING THE PROCESSING OF PERSONAL DATA IN PK VESTA LLC"
Clear