
PK VESTA announces the completion of the construction of a pre-engineered store/supermarket 24W x 42L x 4.8H in Krasnodar, Russia
The Tula plant delivered and completed the construction of a prefabricated store/supermarket 24W x 42D x 4.8V in Krasnodar, Russia. The client had been looking for a plant in Russia for a long time. On the Internet, he accidentally calculated the cost of a steel structure in the free online web service WebSteel. He negotiated with the plant directly, clarified the prices and terms of the contract and decided to place an order for a steel structure.
The pre-engineered supermarket was designed on the basis of a proven and classic HYBRID system (columns are made out of red-iron metal, and trusses and purlins are made out of cold-formed galvanized profiles) There are no columns inside. The upper part of the steel frame has 100% corrosion protection. Everything is assembled on a 100% bolted connection without welding and self-tapping screws. A stepped parapet is used on the front side. The frame is covered with non-combustible sandwich panels (walls - 100 mm and roof - 120 mm)
 
                               
                              


 
                                             
    
                     
		                 
		                 
		                 
		                 
		                 
		                




