All MARKET SEGMENTS OF BUILDINGS
«Free 3D building designer and calculator»
The price for the complete building
from .... /m2 without VAT
?

IMPORTANT! All prices for steel buildings are indicative and given for preliminary acquaintance with the approximate budget for the construction of your building. Nothing is fixed until agreed and confirmed in regards to all technical details of a cetain client's project. Too many factors affect the price level (combination of climatic zones, building dimensions, floating prices for raw materials, labor costs in different countries, bay spacing betweek steel frames, availability of geo-survey work, non-standard loads on walls and roofs, etc.) For more accurate calculation, use the free WebSteel online system (online accounting of the costs and availability of materials at the factory’s warehouse, certain design schemes and solutions) or make a detailed request for a price proposal at the Russian factory in Tula

Related industries: Church, Sheep farm
General:
  • Brand:
    PK VESTA
  • Country/Origin of Goods:
    Russia
  • Place of production:
    Tula, Russia
  • FEA code:
    9406903908
  • Supply of building kits:
    Eurasia, Africa, Middle East, Latin America
  • Condition of buildings:
    made "to order" from scratch (new)
  • Delivery :
    land and/or sea (euro trucks and 40ft containers)
  • Structural warranty:
    at least 50 years old
  • Product warranty:
    1 to 5 years
  • Series:
    INDI (Customized on order), TYP Series (Standard after project)
  • Scheme and form of payment:
    40%x30%x30% and 70%x30% (L/C - letter of credit, T/T - bank transfer, D/P - payment after receiving a document confirming the shipment of goods by the seller)
  • Delivery conditions:
    EXW, FOB, CIP, DAF, DDP
Load-bearing structures
  • Frame technologies:
    LGF (cold-formed galvanized profiles), Rigid Framing (ferrous metal welded I beams) and HYBRID systems (LGF + Rigid Framing)
  • Element type:
    H Beams (I-Beam), C Trusses/Columns (C-Channel)
  • Roof type:
    Gable, single-slope, extensions, superstructures and flat roofs (single-span and multi-span)
  • Accessories:
    All high-strength bolts (except anchor bolts), full trimming package, diagonal ties and connecting elements are included. Gates, doors, windows, skylights, canopies, transparent panels, solar panels
  • Steel type:
    С245, С350, С345, C390 and C420
  • Galvanizing class:
    only I (275 g/m2)
  • Metal Suppliers:
    Russian Novolipetsk Iron and Steel Works and SeverStal
  • Secondary Elements:
    Diagonal connections, secondary framing system (C-shaped, W- shaped. and Z- shaped)
  • Preparation level of elements:
    High (numbering of elements taking into account cutting to the desired length, punching holes and a packing list for quickly finding the right pack at the construction site)
  • Connection of elements:
    Only 100% bolted-together connection design (high strength and normal strength bolts)
  • Protection of ferrous metal elements:
    Powder coating and/or hot dip galvanizing
  • Accounting for client technology:
    Included if needed
Enclosing structures
  • Sheathing:
    sandwich panels (mineral wool, polystyrene and PIR), sheet-by-element assembly (mineral wool), corrugated sheet (cold version), ventilated facades (metal cassettes, composite cassettes and porcelain stoneware – based on the mineral wool) and membrane roof
  • Accessories:
    trimming package (flashing, framing openings, etc.), fasteners (self-tapping screws), skylights (or transparent panels), ventilation, sectional / swing gates, double-glazed windows (up to 6 chambers), solar panels and awnings.
  • Thermal circuit:
    internal (panels from inside the frame are mounted) or external (all panels are mounted from the outside)
  • Basic colors (RAL):
    White (9003), Gray (7004), Blue (5005), White-Aluminum (9006), Beige (1014), Yellow (1018), Green (6002), Light Gray (9002), Brown (8017)
  • Mineral wool density:
    not less than 100 kg/cu.m.
  • Sheet thickness:
    0.5mm, 0.6mm, 0.7mm, 0.8mm and 1mm (galvanized)
  • Preparation level of elements:
    High (numbering of elements taking into account cutting to the desired length, punching holes and a packing list for quickly finding the right pack at the construction site)
Projects and Documents
  • Nordic Base Loads:
    Snow (from 180 kg/sq.m. and above), Wind (from 32 kg/sq.m. and above) and Seismic – 6 points (MSK) Technological load: from 20 kg/sq.m. and higher.
  • Base loads for southern countries:
    Snow (not taken into account), Wind (from 48 kg / sq.m. and above) and Seismic - 7 points and above (Richter Scale) Technological load: from 20 kg / sq.m. and higher.
  • Main projects:
    assembly diagrams and instructions, diagrams of columns for the foundation, structure project (metal structures), cladding project (facade solutions), technical passport. Taking into account the state or commercial expertise.
  • Degree of fire resistance of the building:
    IV-I
  • Certification:
    ISO
  • Disclaimer:
    when exporting buildings to other countries, different building codes are taken into account (European, American) and any other at the place of construction (Middle East, Africa, Asia, Latin America, etc.)
Making an I-shaped (H) welded beam
  • Metal cutting:
    into strips of the desired length on a powerful high-precision laser machine
  • Assembly:
    workpieces on the base
  • Welding:
    all main elements
  • Process:
    straightening elements on the mill
  • Partial welding:
    bases of columns and stiffeners
  • Final preparation:
    sand blasting / shot blasting / hot dip galvanizing
  • Painting:
    included (upon request)
  • Factory primer:
    included (20, 40, 60, 80, 100 microns and above)
  • Package:
    in packs for euro trucks or 40 feet for containers
Making a C-profile
  • Process:
    cold-formed metal profiling
  • Cutting and punching holes:
    included (in auto mode)
  • Painting:
    not included (high anti-corrosion properties)
  • Package:
    in packs for euro trucks or 40 feet for containers

Construction of buildings for the production of plastics

The best solution for a plastics plant is prefabricated Rigid Framing or LSF technologies. Industrial facilities will favorably differ from capital ones in the speed of construction and installation works, mobility, low price, while maintaining reliability and quality.

A feature of prefabricated technologies is the use of enlarged metal profiles that are completely ready for assembly, which saves up to 30% of funds. A detailed study of the project is an opportunity not only to minimize any kind of costs, but also to make the facility as efficient as possible. Their important advantages:

  1. a solid foundation, as automated lines are used in the technological chain;
  2. large internal volume;
  3. effective protection against the influence of external factors;
  4. compliance with increased fire safety requirements.

Building design for plastic production

When designing, unified metal structures are used. But planning solutions and the layout of the main storage areas are calculated individually, taking into account the characteristics of the raw materials used, technological processes and the complexity of the equipment.

Chemical resistance, thermosetting, thermoplasticity of products are determined, and the amount of recycling is taken into account. For a workshop for the production of plastic products, space zoning is necessary. Mandatory sections:

  1. the main ones, on which automated lines are located;
  2. warehouses, as a rule, they provide for the use of lifting mechanisms;
  3. auxiliary, office and household premises;
  4. transport and pedestrian zones.
  5. a multi-stage process requires at least 150 sq. m. area.
  6. to ensure full automation, it is necessary to equip with signaling devices and sensors.

Stages of construction of a workshop for the production of plastic products

  1. Strict adherence to the sequence of stages is a guarantee of obtaining a durable energy-efficient building that is not inferior in strength and reliability to a capital structure, but in many respects even surpasses it.
  2. At the preparatory stage, site planning is required, the territory is fenced, entrances are equipped, equipment is relocated, temporary structures and engineering communications are installed.
  3. A light foundation is being built: tape, shallowly buried or piled, since the metal profiles have a relatively small weight, and, therefore, give a small load to the base.
  4. Elements of the metal frame come from the factory to the construction site prepared for assembly. A durable protective coating is used to protect against corrosion. Rigid Framing or LSF are mounted together with girders, which ensures the most even distribution of the load on the base. Having ensured the stability of the system, proceed with the installation, leaving openings for the installation of equipment.
  5. The engineering infrastructure (internal and off-site) is being set up. After the installation is completed, finishing is carried out: window and door blocks are installed, painting and cladding are performed.


Advantages of steel buildings from metal structures

  1. The main advantages are the high speed of construction and economy, as well as the ability to minimize the weight of the finished structure. A light foundation will make the job easier. In addition, no heavy equipment is required.
  2. The frame facilitates the installation of a large number of equipment and reduces transport costs.
  3. Construction and arrangement of a workshop for the manufacture of plastic products
  4. Based on prefabricated technologies - an environmentally friendly and waste-free solution. Since "wet" operations are completely absent, you can mount the building in any season.
  5. Sandwich panels used as enclosing structures perfectly save heat, structure and have high thermal and noise insulation characteristics.
  6. The steel buildings are mobile buildings. This means that they can be easily expanded and completed without a major stop. If it becomes necessary to transport it to another site, it can be completely disassembled and assembled at a new location after transportation.
  7. Structures based on metal profiles do not harm the environment, so installation can be carried out even within the boundaries of the settlement.
  8. Service life - at least 40 years with strict compliance with all construction and sanitary standards.\

Calculate the cost of building a plant for the production of plastic products

The cost is calculated according to the following parameters:

  1. scale;
  2. characteristics and range of polymer raw materials;
  3. features of technological lines, including the possibility of recycling plastic;
  4. parameters of the selected structural elements;
  5. remoteness of main communications.

When designing, you can choose a standard project and then adapt it to specific needs, or develop an individual one from scratch, taking into account the specifics of the work as much as possible. Investments in the production of plastic pay off within 2-3 years. You can calculate the payback more accurately yourself using the WebSteel® service for online design.

It is advisable to use it even before contacting professional designers. A multifunctional service allows you to quickly make the necessary calculations, even if you do not have engineering skills, and instantly analyze the change in the price of a steel building when the layout changes. By changing the type of roof structures, the number of entry groups and partitions, it is possible to reduce or increase the cost of prefabricated buildings.

The service allows not only to make basic calculations, but also to exchange technical documentation with an enterprise that manufactures metal structures, and visualize an object using 3D technologies.

Choosing PK VESTA you will receive:

1.    The new philosophy and innovative business model of the “Smart Techno Design” allowing a client to quickly visualize pre-engineered steel buildings online in new service WebSteel, calculate main building costs instantly with automatic consideration of climatic zones (snow, wind and seismic), receive basic sketches with a detailed technical specification and order a turnkey building kit online from the factory to anywhere in the world. 
2.    Unique building solutions from an old factory in the famous Russian industrial city of Tula (metal craftsmanship since the 17th century) offered specifically for you to design and manufacture energy-efficient