All MARKET SEGMENTS OF BUILDINGS
«Free 3D building designer and calculator»
The price for the complete building
from .... /m2 without VAT
?

IMPORTANT! All prices for steel buildings are indicative and given for preliminary acquaintance with the approximate budget for the construction of your building. Nothing is fixed until agreed and confirmed in regards to all technical details of a cetain client's project. Too many factors affect the price level (combination of climatic zones, building dimensions, floating prices for raw materials, labor costs in different countries, bay spacing betweek steel frames, availability of geo-survey work, non-standard loads on walls and roofs, etc.) For more accurate calculation, use the free WebSteel online system (online accounting of the costs and availability of materials at the factory’s warehouse, certain design schemes and solutions) or make a detailed request for a price proposal at the Russian factory in Tula

Related industries: Factory, Nuclear materials plant
General:
  • Brand:
    PK VESTA
  • Country/Origin of Goods:
    Russia
  • Place of production:
    Tula, Russia
  • FEA code:
    9406903908
  • Supply of building kits:
    Eurasia, Africa, Middle East, Latin America
  • Condition of buildings:
    made "to order" from scratch (new)
  • Delivery :
    land and/or sea (euro trucks and 40ft containers)
  • Structural warranty:
    at least 50 years old
  • Product warranty:
    1 to 5 years
  • Series:
    INDI (Customized on order), TYP Series (Standard after project)
  • Scheme and form of payment:
    40%x30%x30% and 70%x30% (L/C - letter of credit, T/T - bank transfer, D/P - payment after receiving a document confirming the shipment of goods by the seller)
  • Delivery conditions:
    EXW, FOB, CIP, DAF, DDP
Load-bearing structures
  • Frame technologies:
    LGF (cold-formed galvanized profiles), Rigid Framing (ferrous metal welded I beams) and HYBRID systems (LGF + Rigid Framing)
  • Element type:
    H Beams (I-Beam), C Trusses/Columns (C-Channel)
  • Roof type:
    Gable, single-slope, extensions, superstructures and flat roofs (single-span and multi-span)
  • Accessories:
    All high-strength bolts (except anchor bolts), full trimming package, diagonal ties and connecting elements are included. Gates, doors, windows, skylights, canopies, transparent panels, solar panels
  • Steel type:
    С245, С350, С345, C390 and C420
  • Galvanizing class:
    only I (275 g/m2)
  • Metal Suppliers:
    Russian Novolipetsk Iron and Steel Works and SeverStal
  • Secondary Elements:
    Diagonal connections, secondary framing system (C-shaped, W- shaped. and Z- shaped)
  • Preparation level of elements:
    High (numbering of elements taking into account cutting to the desired length, punching holes and a packing list for quickly finding the right pack at the construction site)
  • Connection of elements:
    Only 100% bolted-together connection design (high strength and normal strength bolts)
  • Protection of ferrous metal elements:
    Powder coating and/or hot dip galvanizing
  • Accounting for client technology:
    Included if needed
Enclosing structures
  • Sheathing:
    sandwich panels (mineral wool, polystyrene and PIR), sheet-by-element assembly (mineral wool), corrugated sheet (cold version), ventilated facades (metal cassettes, composite cassettes and porcelain stoneware – based on the mineral wool) and membrane roof
  • Accessories:
    trimming package (flashing, framing openings, etc.), fasteners (self-tapping screws), skylights (or transparent panels), ventilation, sectional / swing gates, double-glazed windows (up to 6 chambers), solar panels and awnings.
  • Thermal circuit:
    internal (panels from inside the frame are mounted) or external (all panels are mounted from the outside)
  • Basic colors (RAL):
    White (9003), Gray (7004), Blue (5005), White-Aluminum (9006), Beige (1014), Yellow (1018), Green (6002), Light Gray (9002), Brown (8017)
  • Mineral wool density:
    not less than 100 kg/cu.m.
  • Sheet thickness:
    0.5mm, 0.6mm, 0.7mm, 0.8mm and 1mm (galvanized)
  • Preparation level of elements:
    High (numbering of elements taking into account cutting to the desired length, punching holes and a packing list for quickly finding the right pack at the construction site)
Projects and Documents
  • Nordic Base Loads:
    Snow (from 180 kg/sq.m. and above), Wind (from 32 kg/sq.m. and above) and Seismic – 6 points (MSK) Technological load: from 20 kg/sq.m. and higher.
  • Base loads for southern countries:
    Snow (not taken into account), Wind (from 48 kg / sq.m. and above) and Seismic - 7 points and above (Richter Scale) Technological load: from 20 kg / sq.m. and higher.
  • Main projects:
    assembly diagrams and instructions, diagrams of columns for the foundation, structure project (metal structures), cladding project (facade solutions), technical passport. Taking into account the state or commercial expertise.
  • Degree of fire resistance of the building:
    IV-I
  • Certification:
    ISO
  • Disclaimer:
    when exporting buildings to other countries, different building codes are taken into account (European, American) and any other at the place of construction (Middle East, Africa, Asia, Latin America, etc.)
Making an I-shaped (H) welded beam
  • Metal cutting:
    into strips of the desired length on a powerful high-precision laser machine
  • Assembly:
    workpieces on the base
  • Welding:
    all main elements
  • Process:
    straightening elements on the mill
  • Partial welding:
    bases of columns and stiffeners
  • Final preparation:
    sand blasting / shot blasting / hot dip galvanizing
  • Painting:
    included (upon request)
  • Factory primer:
    included (20, 40, 60, 80, 100 microns and above)
  • Package:
    in packs for euro trucks or 40 feet for containers
Making a C-profile
  • Process:
    cold-formed metal profiling
  • Cutting and punching holes:
    included (in auto mode)
  • Painting:
    not included (high anti-corrosion properties)
  • Package:
    in packs for euro trucks or 40 feet for containers

PK Vesta offers the construction of prefabricated steel buildings for wood processing from sandwich panels on a turnkey basis using modern technologies. We produce reliable, durable structures in accordance with customer requirements, characterized by high functionality and energy efficiency. Prefabricated buildings from our company are an opportunity to save time and money, since their construction will take a few months, and the price is several times lower than that of a capital structure.

Buildings for the production of wood have specific requirements for area, heat and sound insulation. To reduce costs and obtain the necessary technical characteristics of the structure, we recommend choosing turnkey construction using modular technology.

On our website you can design a future object, visualize, calculate the cost and place an order. For further advice, fill out the form on our website or contact us by phone.


Woodworking plant, calculation of the construction of a prefabricated building

Деревообрабатывающий заводTimber processing is a profitable business in any economic conditions, so the construction of such enterprises is widespread in our country. Factories are divided by finished products:

  1. glued wood. This includes veneer, plywood, composite boards;
  2. elements of wooden houses;
  3. classic blanks and lumber - timber, boards, chips, logs.

Specialization must be taken into account in the requirements for each project.

The problem for investors is the choice of premises: capital construction is expensive, and finding a building that meets all the requirements for rent is far from easy. A good solution will be prefabricated construction technologies, with which you can build industrial buildings as quickly as possible. The cost of construction is reduced by 25 - 30%.


Basic design requirements

The projects of specialized woodworking enterprises take into account the mandatory requirements for arrangement.

For the treatment of wood with antiseptics and flame retardants, isolated rooms with a powerful ventilation system are required;

  1. In rooms for chamber drying it is necessary to install thermal and ventilation systems.
  2. Workshops for the production of glued products are also equipped with local exhaust ventilation.
  3. Be sure to include in the project household premises, dressing rooms, sanitary facilities.
  4. Each workshop is equipped with two emergency exits.

Benefits of using modern building technologies

Деревообрабатывающий завод Веста

Rigid Framing and Light Steel Framing. Durable metal structures treated with anti-corrosion compounds can be used for the construction of workshops of any size. They fully comply with safety requirements, including fire safety, and sanitary standards for woodworking enterprises.

The high speed of installation is due to the simplicity of the technological processing of materials: they arrive at the construction site in a state of complete factory readiness. There is no need to use heavy construction equipment.

In case of damage of any degree of complexity, repair will take a minimum of time.

The service life of prefabricated buildings is at least 30 years. The building is energy efficient, resistant to moisture, mold damage.

An additional advantage is mobility h: structural elements are connected by bolts: if necessary, the building or part of it can be dismantled and transferred to another site. It can also be quickly completed when expanding production.


Construction cost calculation

Prices depend on the following factors:

  1. Dimensions of the building and its architectural complexity
  2. Time limits.
  3. Materials used - types of metal structures and enclosing panels.

At the initial stage of calculations, when choosing the optimal layout, there is no need to contact professional designers.

PK VESTA has developed a convenient WebSteel® service, with which you can make calculations online. The service will automatically calculate the necessary parameters, so when working with it, specialized technical knowledge is not required.

The cost of the steel building and the optimal layout can be calculated independently, and then the object can be visualized using 3D modeling.

Choosing PK VESTA you will receive:

1.    The new philosophy and innovative business model of the “Smart Techno Design” allowing a client to quickly visualize pre-engineered steel buildings online in new service WebSteel, calculate main building costs instantly with automatic consideration of climatic zones (snow, wind and seismic), receive basic sketches with a detailed technical specification and order a turnkey building kit online from the factory to anywhere in the world. 
2.    Unique building solutions from an old factory in the famous Russian industrial city of Tula (metal craftsmanship since the 17th century) offered specifically for you to design and manufacture energy-efficient custom prefabricated steel buildings made out of lightweight metal structures. 
3.    Particular emphasis on the quality of our products, the high safety and reliability of our production facilities with the high automation of working processes and the latest IT technologies in the 24/7 format of customer service via the Internet in global markets (Eurasia, Africa, the Middle East and Latin America)  


Technology comparison:

List LSGF (profiles)
Rigid framing (welded beams)
Concrete

1) Metal consumption of Steel framing Low Medium High
2) Load-bearing capacity
High High High
3) Complexity of manufacturing
Low Medium Medium

4) Complexity of erection
Low Medium Medium
5) Anticorrosion properties
High Low Low
6) Foundation costs
Low Medium High

7) Capacity in one vehicle
High Medium Low
8) Welding process
Missing Available Missing
9) Level of fire resistance
Medium
High High

10) Manufacturing defect rate
The error in punching holes, cutting elements to the desired length - low.
The effect of mushroom and crescent after welding at the factory - medium / high. Concrete chips, cracks, gaps and rebar displacement - low / medium.
11) Frequency of us